NewOasisForLife

 Forgot password?
 Register
Recommended reading
View: 5505|Reply: 0

[2009-2014 Yunnan] Building the Hall in Dahe Chuan Area

Post time 2017-07-11 17:18:40 | 5505views0replies Show the author posts only |View large image Reply Awards |Descending
|Read mode

[Copy link]

876

Threads

919

Posts

4131

Credits

Elder

Rank: 8Rank: 8

Credits
4131
Series of Reports on the Building of 4th branch(7)

—— the Second Phase Dec 2011

Editor's note: the main project of the second phase is to build forty-seven (47) independent bedrooms, a beautiful dining hall, and a spacious activity hall in the Dahe Chuan area. Each hall will accommodate about two-hundred (200) people. In November of 2011, it was still a wasteland with only a large abandoned hen house, but after one and a half years of building, it has become a very beautiful and poetic residence of the Second Home.

Building the Hall in the Dahe Chuan area

Xuefeng

December 8, 2011

(Translated by Tongxin and Edited by Kaer)

We worked hard from dawn to dusk, swinging shovels and pickaxes, positioning each brick and tile, building our home. We carried sand, paved and fixed the roads, built walls, and mounted the roofs. Unafraid of heavy work or dusty and dirty conditions or of how tired we are, we had no regrets as we toiled to create our beautiful paradise, our new home.























Reply

Use magic Report

0replies
Jump to specified page

发表回复

You have to log in before you can reply Login | Register

Points Rules

Archiver|Mobile|NewOasisForLife

2024-11-22 20:15 GMT+8 , Processed in 0.073254 second(s), 19 queries.

Powered by Discuz! X3.2 Copyright
© 2001-2017 Comsenz Inc.    All Rights Reserved.

Quick Reply To Top Return to the list