NewOasisForLife

 Forgot password?
 Register
Recommended reading
View: 3292|Reply: 0

[2014-2015 Xinjiang] [April 25, 2014] The Mechanical Digger and Deep Well Sinker are Used Together

Post time 2017-07-15 14:39:06 | 3292views0replies Show the author posts only |View large image Reply Awards |Descending
|Read mode

[Copy link]

876

Threads

919

Posts

4131

Credits

Admin

Rank: 9Rank: 9Rank: 9

Credits
4131
The Mechanical Digger and Deep Well Sinker are Used Together in Gesaer Farm

Xuefeng

April 25, 2014

(Translated by Xidai and Edited by Kaer)


The workload is huge at Gesaer Farm. We need to tear down the houses, dig ditches, and level the lands. The water quality here is not very good, so we  drilled a well in the yard for drinking. Because of the the lack of rain, we  pulled electrical wires to the orchards and drilled wells for water. Thousands of  jujube trees and apple tress have sprouted, and twenty brothers andsisters worked so hard, they were thoroughly wet. Big changes are happening at Gesaer Farm. In the future, the yard of Gesaer Farm will be connected directly to the Tarim river.



































Reply

Use magic Report

0replies
Jump to specified page

发表回复

You have to log in before you can reply Login | Register

Points Rules

Archiver|Mobile|NewOasisForLife

2024-5-3 07:26 GMT+8 , Processed in 0.038960 second(s), 20 queries.

Powered by Discuz! X3.2 Copyright
© 2001-2017 Comsenz Inc.    All Rights Reserved.

Quick Reply To Top Return to the list